• One Containerized unit 60 TIGD. Commissioned in 1997.
• Skid Mountain two RO units each 70 TIGD. Commissioned in 1995.
• Underground wells 8 Numbers.
• Potable Storage Tank (Steel) 100 KIG.
• Four R.O. skids each 50,000 IGD inside hall.
• Product water tanks GRP Panels 200 KIG.
• Raw Water Tanks 200 KIG.
• Total Numbers of wells are 11 numbers.
• Located in Al Aslab (Distance between wells and RO Plant 25 km).
• Part of wells production used as raw water for RO Plant.
• Rest of wells production (TIG/month 2,400 ) dispatched to ADM.
• Wells are operated and maintained by AMPC.