Umm Al Zomoul

• One Containerized unit 60 TIGD. Commissioned in 1997.

• Skid Mountain two RO units each 70 TIGD. Commissioned in 1995.

• Underground wells 8 Numbers.

• Potable Storage Tank (Steel) 100 KIG.

New Umm Al Zmoul



New Umm Al Zmoul

• Four R.O. skids each 50,000 IGD inside hall.

• Product water tanks GRP Panels 200 KIG.

• Raw Water Tanks 200 KIG.

Under Ground Wells


• Total Numbers of wells are 11 numbers.

• Located in Al Aslab (Distance between wells and RO Plant 25 km).

• Part of wells production used as raw water for RO Plant.

• Rest of wells production (TIG/month 2,400 ) dispatched to ADM.

• Wells are operated and maintained by AMPC.